campaign-service - Service Readiness
Version: 1.0 Status: Draft (proper stub) Owner: Product Last Updated: 2026-04-21 References: SERVICE_OVERVIEW.md, docs/standards/SERVICE_TEMPLATE.md
0. Status
Proper stub per SERVICE_TEMPLATE.md rule: "Stubs are acceptable for an early service (headings only), but every file is present and owned." Populate in lock-step with implementation; do NOT remove.
Intent
Tracks the production-readiness checklist for campaign-service. See SERVICE_OVERVIEW.md and _report.md.
1. Readiness Gate Checklist
TBD - every item must be green per docs/standards/SERVICE_TEMPLATE.md "Service readiness gate":
- All 17 docs at "Approved" status
- Coverage thresholds met
- tenant-isolation integration test passes
- OpenTelemetry instrumentation verified in staging
- SLOs declared + alerts configured with runbooks
- Canary deploy (5 percent / 30 min) in staging; rollback verified
- On-call rotation assigned
- Tech lead + SRE sign-off