Skip to main content

campaign-service - Service Readiness

Version: 1.0 Status: Draft (proper stub) Owner: Product Last Updated: 2026-04-21 References: SERVICE_OVERVIEW.md, docs/standards/SERVICE_TEMPLATE.md


0. Status

Proper stub per SERVICE_TEMPLATE.md rule: "Stubs are acceptable for an early service (headings only), but every file is present and owned." Populate in lock-step with implementation; do NOT remove.


Intent

Tracks the production-readiness checklist for campaign-service. See SERVICE_OVERVIEW.md and _report.md.


1. Readiness Gate Checklist

TBD - every item must be green per docs/standards/SERVICE_TEMPLATE.md "Service readiness gate":

  • All 17 docs at "Approved" status
  • Coverage thresholds met
  • tenant-isolation integration test passes
  • OpenTelemetry instrumentation verified in staging
  • SLOs declared + alerts configured with runbooks
  • Canary deploy (5 percent / 30 min) in staging; rollback verified
  • On-call rotation assigned
  • Tech lead + SRE sign-off